Projects we are proud of

From apartment buildings to Prague Zoo. Every project has its story — see how we work.

9 completed projects
8.5+ million CZK total value
300 radiators removed
700 m of piping replaced
Apartment Building 2023–2024

BD Milovice — Hydraulic Balancing of Heating in Two Apartment Buildings

Overheated flats upstairs, cold ones downstairs. We balanced 300 radiators across two buildings so every flat gets exactly the heat it needs.

CZK 1.3M Apartment Buildings Milovice Hydraulic balancing of heating system
Balancing valvesCirculation pump
Full project story
Flat 2024

Praha 7 — Complete Pipe Replacement in a Residential Flat

Full replacement of all pipes in a flat — water, heating, and drainage. ALPEX system with a 50+ year lifespan, replacing old pipes that dated back to the communist era.

CZK 300k Praha 7 Pipe replacement
ALPEXHT
Full project story
Our biggest project
Institution 2023

Klicov Centre — Replacing 700 Metres of Pipes in Critical Condition

700 metres of new piping in an educational institution, where work had to be coordinated around school schedules and student accommodation. Our largest project to date.

CZK 1.6M Klicov Educational Institution Emergency pipe replacement
Press-fit steelPPR
Full project story
Public building 2023

District Court Nymburk — Boiler Room Reconstruction, 300 kW

New 300 kW boiler room for a district court. Junkers boilers, Siemens fault signalling, and the meticulous documentation that public institutions require.

CZK 1.1M District Court Nymburk Boiler room reconstruction
Welded steelPPRHT
Full project story
Public building 2023

KD Hostovice — Complete Heating System Replacement

Complete heating system replacement in a community centre — from the boiler room to the last radiator. All without a single cancelled event.

CZK 1M Community Centre Hostovice Heating system replacement
Press-fit copperPress-fit steel
Full project story
Institution 2023

Zoo Praha — Water Pipe Replacement in the Predator Pavilion

Press-fit stainless steel in the predator pavilion. Work coordinated around zoo operations — and with the residents behind the wall.

CZK 900k Zoo Praha Pipe system replacement
Press-fit stainless steel
Full project story
Zoo Praha
Commercial property 2023

Restaurant Pribram — New Heating System from Boiler to Radiators

New condensing boiler and radiators. The restaurant needed reliable heating without disrupting operations, and lower gas costs.

CZK 600k Restaurant Pribram Heating system reconstruction
Press-fit copper
Full project story
Apartment 2023

Praha 6 Vokovice — Complete Pipe Reconstruction in a 120 m² Apartment

A 120 m² apartment with underfloor heating throughout. Delivered as a subcontractor — every trade had to fit together perfectly.

CZK 400k Praha 6 – Vokovice Pipe reconstruction + underfloor heating
REHAUPress-fit copperPPRHT
Full project story
Apartment Building 2023

BD Klecany — Installation of Three Acond Heat Pumps

Three Acond heat pumps for an entire apartment building. 1,500-litre buffer tanks and press-fit copper distribution. Energy savings for every resident.

CZK 300k Apartment Building Klecany Heat pump installation
Press-fit copperPPRHT
Full project story